Terminals and berths

Multifunctional berth 1 - 3

  • LP 1-3 Terminal area: 260,000 m²
  • Berths: 3 Quay
  • length: 840 m
  • Draft: up to 15.10 m
  • Start of construction: May 1994
  • Completion: August 1997
  • Special feature: 2 RoRo ramps (each with a load capacity of 350 metric tons)

    Operator: Cuxport GmbH

Berth 4

Terminal area: 85,000 m²
Berths: 1
Quay length: 292 m
Draft: up to 14.90 m
Start of construction: 04/2016
Completion: 12/2018
Special feature: 1 berth for jack-up vessels

Operator: Cuxport GmbH


Berth 5-7

Terminal area: 380,000 m²

Draft: up to 14.90 m

Start of construction: 2025

Completion: 2028
Special feature: Berths 5–7 with a continuous length of up to 1,250 m

 

Operator: Cuxport GmbH / Blue Water BREB GmbH

Berth 8

Terminal area: 85,000 m²

Berths: 1 Quay

length: 292 m

Draft: up to 14.90 m

Start of construction: 04/2016

Completion: 12/2018

Special feature: 1 berth for jack-up vessels

 

Operator: Cuxport GmbH


Terminal II 9.1. - 9.3.

Terminal area: 76,800 m²

Berths: 5

Quay length: 737 m

Draft: up to 10.60 m

Start of construction: May 2010

Completion: June 2017

Special features: 2 jack-up berths,

1 RoRo ramp

 

Operators: Blue Water BREB GmbH Siemens Gamesa Renewable Energy (SGRE)

berth 9.4 - 9.5

Draught: 9,50 m – 12,70 m
Terminal space: 116.000 m2
Special feature: 1 RoRo-ramp (1.200 t load capacity)