OFFSHORE PROJECTS

...IN WHOSE STORAGE, LOGISTICS OR PRODUCTION CUXHAVEN AS AN OFFSHORE BASE WAS SIGNIFICANTLY INVOLVED

BARD Offshore I

Offshore-windfarm „BARD Offshore I“

Owner: Ocean Breeze Energy GmbH & Co. KG [is held indirectly 100% from the  Uni Credit Bank AG (München)]

  • production of  80 tripiles (foundation structures)
  • storage and shipping of 80 tripiles into the offshore construction field
  • storage and shipping of 240 ramming pipes for the tripiles into the offshore construction field
  • production of 49 from 80 towers
  • storage and shipping of the tower sections into the offshore construction field
  • Dispatch of the hotel ship Regina Baltica (24 calls at the port)
  • shipping of the  tripiles into the offshore construction field
  • Loading and transport from a living and transformer platform
  • Management of the installation ship Wind Lift 1

Amrumbank West

Offshore-windfarm „Amrumbank West“
Ownerr: Amrumbank West GmbH (c/o E.ON Climate & Renewables Central Europe GmbH)

  • storage and shipping of 80 monopiles into the offshore construction field
  • storage and shipping of  80 transition pieces into the offshore construction field
  • storage and shipping the inner park cabling
  • final equipment of the installation ship Siem Moxie

Meerwind Süd/Ost

Offshore-windfarm „Meerwind Süd/Ost“
Owner: WindMW GmbH (Three Gorges Offshore Germany GmbH & Windland Energieerzeugungs GmbH)

  • production of 80 monopiles
  • storage and shipping of 80 monopiles into the offshore construction field
  • production of  80 transition pieces
  • storage and shipping of  80 transition pieces into the offshore construction field
  • storage and shipping the scour protection

Global Tech I

Offshore-windfarm „Global Tech I“
Owner: Global Tech I Offshore Wind GmbH (u.a. SWM, HEAG, Axpo International, Esportes, Norderland)

  • production of tower sections
  • storage and shipping of the tower sections into the offshore construction field

Nordergründe

Offshore-windfarm  „Nordergründe“
Owner: OWP Nordergründe GmbH & Co. KG (wpd AG & John Laing Group plc.)

  • production of 18 monopiles
  • storage and shipping of the monopiles into the offshore construction field
  • production of transition pieces
  • storage and shipping  of the transition pieces into the offshore construction field
  • production of tower sections
  • storage and shipping of the transition pieces into the offshore construction field

Nordsee Ost

Offshore-windfarm "Nordsee Ost"

  • production of tower sections
  • storage and shipping of the tower sections into the offshore construction field
  • Equipment of jack-up-barges (mobilization and demobilization)
  • Victoria Matthias and Friedrich Ernestine 

Nordsee One

Offshore-windfarm „Nordsee One" 

  • production of 18 monopiles
  • storage and shipping of the monopiles into the offshore construction field
  • production of  transition pieces
  • storage and shipping  of the transition pieces into the offshore construction field
  • production of tower sections
  • storage and shipping of the tower sections to the installation port Eemshaven

Borkum Riffgrund II

Offshore-windfarm „Borkum Riffgrund II"

  • production of 18 monopiles
  • storage and shipping of the monopiles into the offshore construction field
  • production of  transition pieces
  • storage and shipping  of the transition pieces into the offshore construction field
  • production of tower sections
  • storage and shipping of the tower sections to the installation port Eemshaven